Infrastructure
Engineered for unit-train scale.
100-Car Loop
8 × 300,000 BU
500 TPD
Toronto
Eastern Canada distribution
Houston
Gulf export terminal access
New York
Atlantic seaboard demand
500TPD
Continuous crush capacity
2.4MBU
Total on-site storage
100Cars
Loop track unit train
24/7Ops
Receiving and load-out
Storage and handling
Eight steel bins of 300,000 bushels each provide segregated storage for canola, fed by high-capacity receiving pits and enclosed conveyance. The same logistics backbone supports feedstock intake, meal load-out and renewable diesel movement without breaking the consist.
Integrated renewable-fuels complex
The site is designed around a single value chain: canola crushing, renewable diesel production, advanced stack technology, biochar manufacturing and carbon-credit generation. Co-locating these units maximizes the value extracted from every tonne of seed.